翻訳と辞書 |
M8 Bridge to Nowhere : ウィキペディア英語版 | M8 Bridge to Nowhere
Bridge to Nowhere is a nickname used to refer to various unfinished structures around the M8 motorway in the centre of Glasgow, Scotland. They were built in the 1960s as part of the Glasgow Inner Ring Road project but left incomplete for several years. One 'bridge', at Charing Cross, was completed in the 1990s as an office block. The Anderston Footbridge, a pedestrian bridge south of St Patrick's church, was finally completed in 2013 as part of a walking and cycling route. A third 'Bridge to Nowhere' was created in 2008 following the demolition of a hotel a few blocks away from the M8. ==Charing Cross Podium== The structure officially called the Charing Cross Podium, was always intended to have a development of some sort on the top level. However, the incomplete structure looked like a bridge and was often referred to as the 'Bridge to Nowhere'. When the western flank of the inner ring road was being prepared for tender in the mid-1960s the designer, Scott Wilson & Partners, advised Glasgow Corporation to include the development as part of the motorway construction contract. This advice was ignored with the Corporation hoping that a developer would take on the project, along with the costs. The original plans were for an office complex – which would eventually evolve into what is now Elmbank Gardens – to make use of the structure. In the end, the Elmbank scheme was scaled back and the result was the podium remained incomplete for over two decades, attracting much notoriety at a time when the entire M8 construction project was the subject of very divided public opinion. In the mid-1990s Glasgow District Council at last found an interested party, and a short time later an office block was built. Occupiers of the building known as Tay House include Barclays Bank.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「M8 Bridge to Nowhere」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|